Revision as of 01:21, 9 May 2017 by Matt (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
To build the Jarmish Weirwood docks in Cargo, to be designed by the Asavean Architect


Proposed by Kallavesa, Seconded by Redoubt

Overview

Date

  • Winter 380YE

Cost

  • 15 wains of weirwood
  • 15 wains of white granite
  • 60 crowns in labour costs
  • 3 months to construct

Progress

  • 15 wains of weirwood, 15 wains of white granite, and 60 crowns provided by Olle Markusson after Winter Equinox 380YE.

Campaign Outcome

  • There are necessary details missing from this motion, Senator Kallavesa may decide on these.