IT work required
No edit summary |
No edit summary |
||
Line 1: | Line 1: | ||
{{MARKDOWN}} | {{MARKDOWN}} | ||
### TODO | ### TODO | ||
1. Upgrade favog to a recent OS. Make sure we sort out the disk allocation this time ... | |||
1. Upgrade | |||
1. Secure this section of this wiki | 1. Secure this section of this wiki | ||
1. Monitoring | |||
### Sort of done | ### Sort of done | ||
### Needed | ### Needed | ||
1. | 1. Cisco power supplies | ||
1. | 1. Rubber cable run protectors | ||
1. | 1. 3m poles | ||
1. | 1. Wood screw hooks | ||
1. | 1. Lighting connectors | ||
1. Drawers for small piece storage | |||
1. Dozen 1m patch cables |
Revision as of 14:49, 13 September 2019
- TODO
1. Upgrade favog to a recent OS. Make sure we sort out the disk allocation this time ... 1. Secure this section of this wiki 1. Monitoring
- Sort of done
- Needed
1. Cisco power supplies 1. Rubber cable run protectors 1. 3m poles 1. Wood screw hooks 1. Lighting connectors 1. Drawers for small piece storage 1. Dozen 1m patch cables