Construct Department of Architecture
A motion to construct the Temeschwar University Department of Architecture. Location: Hanuri, Temeschwar. Cost: 60 wains of white granite, 30 wains of weirwood, 180 crowns, 6 months. Effect: creates Imperial Title "Master of Rings". Imperial Title: Master of Rings. Appointment: Annually, League Tally of the Votes. Removal: National League Asssembly/General Assembly/Assembly of Nine. Powers: One civilian build commission a season, and access to a white granite, mithril, weirwood ministry. Responsibility: To use their power to generate as much wealth as possible for the merchant-princes of Temschwar, and for the League, as possible.
Proposed: Temeschwar, Seconded: SemmerholmOverview
- Construct the Department of Architecture as detailed in the Back in the same place wind of fortune
- Passed
Date
- Winter 384YE
Cost
- As per the wind of fortune
- 60 wains of white granite
- 30 wains of weirwood
- 180 crowns
- Six months to complete
Progress
- 9 thrones 1 crown, 20 wains of weirwood and 15 wains of white granite provided by Asael after Winter Solstice 384YE
- 3 thrones 3 crowns and 20 wains of white granite provided by Giuseppe Sanguineo von Temeschwar after Winter Solstice 384YE
- 10 thrones, 3 wains of weirwood and 4 wains of white granite provided by Laughlan Vi Temeschwar after Winter Solstice 384YE
- 2 wains of weirwood and 1 wain of white granite provided by Karo Di Yedinso after Winter Solstice 384YE
- 5 wains of weirwood and 20 wains of white granite provided by Laughlan Vi Temeschwar after Spring Equinox 385YE
Outcome
- Once complete the Master of Rings will be available to appoint by Tally of the Votes
Constitutional Notes
- The Constitutional Court notes that as a title appointed through the Tally of the Votes, it is not subject to revocation by any assembly of the Synod. As such they are presenting an administrative motion at the Spring Equinox to clarify this with the Senate.