Mayor of Caricomare
m (→Selection) |
m (→Removal) |
||
Line 23: | Line 23: | ||
==Removal== | ==Removal== | ||
The Mayor serves until they die, step down or are [[revocation|revoked]] | The Mayor serves until they die, step down or are [[revocation|revoked]]. | ||
The Mayor can be revoked by the League assembly, the General Assembly or the Assembly of Nine. | The Mayor can be revoked by the League assembly, the General Assembly or the Assembly of Nine. |
Revision as of 11:53, 22 October 2014
Overview
The Mayor of Caricomare is an Imperial title awared to a League citizen TBC. It is a National position, appointed by the Senator for Sarvos.
The docks at Caricomare were sunk, along with most of the district, during a terrible storm. In Autumn 378YE, on the thirty year anniversary of their destruction, the Senate authorized an ambitious rebuilding project. The docks would be restored, and along with them much of the ruined district.
The mayor is appointed by the Senator for Sarvos, and in turn helps to appoint that Senator. While questions were raised regarding the constitutional implications of this method of choosing the mayor, there are deemed to be no legal or constitutional problems with the title.
Responsibilities
The title holder is expected to oversee the operation of the Caricomare docks.
Powers
Comfortable Income
As a sinecure, the Mayor of Caricomare Receives an income drawn from the profits made from the Caricomare docks.
The holder of the sinecure receives 15 Crowns in income each season.
Influence
The Mayor of Caricomare represents the people and businesses of that district, and receives 25 votes to use in the election of the Senator for Sarvos.
Selection
The title is appointed by the senator for Sarvos. The title can be held by any League resident of Sarvos.
Removal
The Mayor serves until they die, step down or are revoked.
The Mayor can be revoked by the League assembly, the General Assembly or the Assembly of Nine.
History
The title is currently vacant; the first Mayor of Caricomare cannot be appointed until the rebuilding is complete. The extensive reconstruction project is estimated to finish in Summer 379YE.