No edit summary
mNo edit summary
 
(3 intermediate revisions by one other user not shown)
Line 1: Line 1:
[[Category:Senate Motion]][[Category:381YE Spring]]
__NOTOC__
__NOTOC__
<ic>To commission a fortification in Lestasny, Karsk.
<ic>To commission a fortification in Lestasny, Karsk.
Line 23: Line 24:


====Amendment====
====Amendment====
* Following an [[Amend motion to Fortify Karsk|amendment]] to this motion the Asavean architect, Almodin Oktístis, has begun work on this construction
* Following an [[Amend motion to fortify Karsk|amendment]] to this motion the Asavean architect, Almodin Oktístis, has begun work on this construction
<!--
===Campaign Outcome===
The fortification has been built in the Vale of Ivarsgard and is to be named "Aleksandra's Watch" after the late Aleksandra Irinova Prochnost. The preserved remains of our revered wise one are to be placed in the highest tower of the keep, overlooking the vale. There is a saying among the people of Ivarsgard, "Remember, Grandmother is always watching you". In catacombs beneath the keep, lies the vale's ossuary filled with the bones of those who fell during the Thule invasion. As the white granite used in the construction came exclusively from Veltsgorsk, distinctive bands of red, orange and pink quartz are ever present. A permanent reminder of the night of fire and blood that once happened here. Outside of the Vale, a network of smaller watchtowers and outposts line the Roads throughout Lestasny. The people of Karsk guard their prosperity well.
During the autumn Equinox 381YE, powerful magic was used to greatly increase the speed of construction allowing the fortification to be completed in nine months rather than a year.
-->
 
[[Category: Senate Motion]]

Latest revision as of 21:37, 31 January 2022


To commission a fortification in Lestasny, Karsk.

Self Funded

Proposed by Karsk, Seconded by Miekarova

Overview

Date

  • Spring 381YE

Cost

  • 80 wains of white granite
  • 20 thrones in labour costs
  • 12 months to construct

Progress

  • 20 wains of white granite and 5 thrones provided by Maarit after Spring Equinox 381YE, and one seasons construction has been completed.
  • 20 wains of white granite and 5 thrones provided by Vitaly Grigorovich Dukov after Summer Solstice 381YE, and one seasons construction has been completed.
  • 40 wains of white granite and 10 thrones provided by Vitaly Grigorovich Dukov after Autumn Equinox 381YE, and two seasons construction has been completed.

Amendment

  • Following an amendment to this motion the Asavean architect, Almodin Oktístis, has begun work on this construction

Campaign Outcome

During the autumn Equinox 381YE, powerful magic was used to greatly increase the speed of construction allowing the fortification to be completed in nine months rather than a year.