No edit summary
No edit summary
 
(7 intermediate revisions by 4 users not shown)
Line 1: Line 1:
{{stub}}{{Senate Motion}}
<ic>To commission a mithril mine in Sermersuaq
<ic>To commission a mithril mine in Sermersuaq


Line 14: Line 13:


===Cost===
===Cost===
* The Senator may choose either of the options present by the Civil Service
* The Senator may choose either of the options [[Black_and_white#Construction|presented by the Civil Service]].
* 100 Thrones, 6 months to construct
** ''either'' 100 Thrones, 6 months to construct, 10 wains each season projected production.
* 200 Thrones, 9 months to construct  
** ''or'' 200 Thrones, 9 months to construct, 15 wains each season projected production.


===Progress===
===Progress===
* Unknown
* 330 Thrones disbursed to Senator Sermersuaq
* 200 Thrones supplied by Atte Arrow-Tongue Metsastajason, Senator for Sermersuaq.


===Campaign Outcome===
===Campaign Outcome===
* Once the mine is complete, it will create a new Seat on the Imperial Bourse. When it produces it's first load of mithril, a Senator will be able to propose a motion to allocate the Seat as either National or Imperial.
* Once the mine is complete, it will create a new seat on the Imperial Bourse.  
 
* When it produces its first load of mithril, a senator will be able to propose a motion to allocate the seat as either National or Imperial.
===Constitution===
* As 200 Thrones have been committed to the project, the mithril mine will take nine months to complete, meaning that unless something goes wrong it will be available for allocation at the Autumn Equinox 380YE.
*
[[Category: Senate Motion]]
[[Category:379YE Winter]]
__NOTOC__

Latest revision as of 17:58, 2 February 2022

To commission a mithril mine in Sermersuaq


Proposed by Sermersuaq, Seconded by Mitwold

Overview

  • Passed
  • Passed at 330 Thrones
  • This motion was to take advantage of the recent discovery at the Face of Ikka, Suaq Fount, Sermersuaq

Date

  • Winter 379YE

Cost

  • The Senator may choose either of the options presented by the Civil Service.
    • either 100 Thrones, 6 months to construct, 10 wains each season projected production.
    • or 200 Thrones, 9 months to construct, 15 wains each season projected production.

Progress

  • 330 Thrones disbursed to Senator Sermersuaq
  • 200 Thrones supplied by Atte Arrow-Tongue Metsastajason, Senator for Sermersuaq.

Campaign Outcome

  • Once the mine is complete, it will create a new seat on the Imperial Bourse.
  • When it produces its first load of mithril, a senator will be able to propose a motion to allocate the seat as either National or Imperial.
  • As 200 Thrones have been committed to the project, the mithril mine will take nine months to complete, meaning that unless something goes wrong it will be available for allocation at the Autumn Equinox 380YE.